- The new 500 MW capacity in Andhra Pradesh consists of a single project of 350 MW and three projects for 50 MW each. The three 50 MW projects will have a domestic content requirement for cells and modules.
- NTPC Ltd. has invited online bids on Single Stage Two Envelope Bidding Basis (Envelope-I: Technical Bids & Envelope-II: Price Bid) followed by Reverse Auction from interested Solar Power Project Developers for selection of Solar PV Power Projects to be setup in Gani-Sakunala Solar Park Phase II, Kurnool District, Andhra Pradesh under NSM Phase-II, Batch-II, Tranche-I for total capacity 500 MW (350MW x 1 project under Open Category and 50MW x 3 Projects under DCR category).
- Request for Selection (RfS) document shall be available for downloading free of cost by all interesting parties from 09:00 Hrs (IST) on 28/05/2015 to 17:00 Hrs (IST) on 26/06/2015.
- Bids for Envelope-I & Envelope-II can be submitted online up to 17:00 Hrs (IST) on 31/07/2015 and Envelope-I shall be opened online on 03/08/2015 at 11:00 Hrs (IST) onwards.
| Downloading of RfS document Date & Timing | From 09:00 Hrs (IST) on 28/05/2015 to 17:00 Hrs (IST) on 26/06/2015 |
| Last date for receipt of queries on RfS from the prospective bidders and Pre Bid Conference Date and time | On 10/07/2015 at 11:00 Hrs (IST) |
| Last Date and Time of Receipt of Bid (Technical Bid & Financial bid – First round tariff bid) through e-bidding | On 31/07/2015 at 17:00 Hrs (IST) |
| Technical Bid Opening Date & Time | On 03/08/2015 at 11:00 Hrs (IST) onwards |
| Date and Time of start of Reverse Auction | To be intimated to all bidders separately |
For Complete Bidding assistance and successful allotment contact us:
EnvironmentFirst Energy Services (P) Ltd
Email: info@environmentfirst.in

Comments are closed.