NTPC has invited bids for selection of 500 MW Solar Power Projects in Andhra Pradesh

  • The new 500 MW capacity in Andhra Pradesh consists of a single project of 350 MW and three projects for 50 MW each. The three 50 MW projects will have a domestic content requirement for cells and modules.
  • NTPC Ltd. has invited online bids on Single Stage Two Envelope Bidding Basis (Envelope-I: Technical Bids & Envelope-II: Price Bid) followed by Reverse Auction from interested Solar Power Project Developers for selection of Solar PV Power Projects to be setup in Gani-Sakunala Solar Park Phase II, Kurnool District, Andhra Pradesh under NSM Phase-II, Batch-II, Tranche-I for total capacity 500 MW (350MW x 1 project under Open Category and 50MW x 3 Projects under DCR category).
  • Request for Selection (RfS) document shall be available for downloading free of cost by all interesting parties from 09:00 Hrs (IST) on 28/05/2015 to 17:00 Hrs (IST) on 26/06/2015.
  • Bids for Envelope-I & Envelope-II can be submitted online up to 17:00 Hrs (IST) on 31/07/2015 and Envelope-I shall be opened online on 03/08/2015 at 11:00 Hrs (IST) onwards.
Downloading of RfS document Date & Timing From 09:00 Hrs (IST) on 28/05/2015 to
17:00 Hrs (IST) on 26/06/2015
Last date for receipt of queries on RfS from the prospective bidders and Pre Bid Conference Date and time On 10/07/2015 at 11:00 Hrs (IST)
Last Date and Time of Receipt of Bid (Technical Bid & Financial bid – First round tariff bid) through e-bidding On 31/07/2015 at 17:00 Hrs (IST)
Technical Bid Opening Date & Time On 03/08/2015 at 11:00 Hrs (IST) onwards
Date and Time of start of Reverse Auction To be intimated to all bidders separately